Email contact@conrema.org
Phone +265 999 608 501
  • Home
  • About
  • News
    • Bio Energy
    • Climate Change
    • Deforastation
    • Energy and Gender
    • Malawi Energy Sector and Policy
    • Re-Strategic and Policy
    • Renewables Vs Fossils
    • Re-afforestation
    • Resources and Tools
    • Solar
    • Technology
    • Uncategorized
    • Forums
  • Project Database
    • Search Database
    • All Projects
    • Add New Project
  • Stakeholders Database
  • Vacancies & Opportunities
  • Downloads
  • Contact
  • Log In

Japan’s K23bn grant to boost power distribution

20 Oct 2021

The Japanese Government has provided a K23.1 billion grant to finance rehabilitation of two Electricity Supply Corporation of Malawi (Escom) key power distribution substations in Lilongwe.

The money will be used to expand and refurbish Kanengo Power Substation and rebuild and refurbish Old Town Power Substation.

Mlusu (L) and Iwakiri sign the pact

Speaking during the signing of the agreement in Lilongwe on Monday, Japanese Ambassador Satoshi Iwakiri said his government is committed to supporting Malawi’s efforts to enhance its socioeconomic development, including infrastructure development in the energy sector.

“Supporting the energy sector in Malawi is one of the priority areas outlined in our official development assistance cooperation with Malawi,” he said.

Iwakiri said it is estimated that the country’s energy demand will rise to 1 155 megawatts (MW) by 2025; hence, the refurbishment of the two substations will enable more people to meet their daily electricity needs through efficiency.

“The refurbishment will also increase economic activities in the city as we are all aware that the inadequate and inefficient supply of electricity affects performance of industries,” he said.

The two substations are said to be in bad state as they were built in 1967 and cannot match the current energy distribution technologies, resulting in power distribution losses.

Minister of Finance Felix Mlusu commended the Japanese Government for the support, saying Malawi’s development will be accelerated through the provision of adequate power supply for both household and industrial needs.

He said: “Our distribution infrastructure in terms of transmission from substations is lacking considering that these were investments made decades ago. We are talking about over 40 or 50 years ago.

“The infrastructure is old and cannot cope with modern demand which is high and supply is low. As we distribute, we are losing a lot of power along the way, thereby affecting end users.”

Escom regional manager (Centre) Macvittie Chiphwanya said the investment is expected to double the distribution capacity of the two substations by maximising their potential.

He said the Old Town Substation was the first infrastructure constructed in Lilongwe which receives power from Nkula Power Station for distribution to the Capital City.

Currently, the country’s energy production capacity is at 441.95MW against a project demand of 800MW.

Source: National_by SteveChilundu_20october,2021.








Post navigation

Escom upbeat on beating Inter connector deadline
Committee quizzes mera on fuel deals

Recent Posts

  • Solar power supplies water to rural areas
  • We no longer do pipes’ work
  • ‘Fetching water was hard labour’
  • Edukans connects 10 schools to solar power
  • Malawi’s growing population, dying environment

Contact Us

Cooperation Network for Renewable Energy in Malawi (CONREMA)

Secretariat

c/o Renew‘N’Able Malawi

P.O. Box 31219 – Blantyre 3

Malawi

Telephone:  +265 999 608 501

Email: contact@conrema.org

Subscribe

Subscribe to our News letters


copyright @ 2018| Developed by Beta Solutions
  • Sign in
  • New account

Show

Forgot your password?

Lost your password? Please enter your email address. You will receive mail with link to set new password.

Back to login

close

Please Login

Registration

Forgotten Password?

Register Forgot Password Back to Login