Email contact@conrema.org
Phone +265 999 608 501
  • Home
  • About
  • News
    • Bio Energy
    • Climate Change
    • Deforastation
    • Energy and Gender
    • Malawi Energy Sector and Policy
    • Re-Strategic and Policy
    • Renewables Vs Fossils
    • Re-afforestation
    • Resources and Tools
    • Solar
    • Technology
    • Uncategorized
    • Forums
  • Project Database
    • Search Database
    • All Projects
    • Add New Project
  • Stakeholders Database
  • Vacancies & Opportunities
  • Downloads
  • Contact
  • Log In

Loadshedding hours increase

23 Mar 2020

Malawians are expected to face at least four days of power woes following Escom’s move to effect a seven-hour Electricity Management Programme (EMP) due to inadequate supply from Egenco and Aggreko.

In a notice we have seen, Electricity Supply Corporation of Malawi (Escom) says there is a substantial increase in electricity demand which the corporation cannot satisfy; hence, effecting an additional two and a half hours loadshedding to the existing four and a half hours which started last month.

Aggreko gensets are said to provide about 78MW

In an interview yesterday, Escom public relations manager Innocent Chitosi confirmed the seven-hour EMP from March 21 to March 24 2020.

He said currently, the average peak hour power demand is at 300 megawatts (MW) but the corporation is getting about 255 MW from Electricity Generation Company (Egenco).

Said Chitosi: “On average, we are getting about 190 MW from hydro-generation and 65MW from diesel-powered generation. Aggreko diesel generators have a maximum capacity of 78MW for six hours.

“So, from 6am to noon, six hours are gone. Yet we have other peak hours in the evening. That is why the generation is spread to ensure that we cover the whole day. We load-shed about 45MW.”

However, speaking in a separate interview, Egenco spokesperson Moses Gwaza said the generation capacity has not changed for the past three weeks since Escom implemented the four and a half hours EMP.

He said the two machines at Kapichira Power Station in Chikwawa and five diesel-powered generators at Mapanga in Blantyre and Kanengo in Lilongwe are still not working.

Out of the three machines and 12 generators that were not working when Escom first effected the four and a half hours ladshedding, the generation company only restored one machine at Kapichira and seven generators.

Said Gwaza: “We were expected to complete maintenance work of the two machines at Kapichira by the end of this month, but we have delayed because we are still waiting for spare parts from South Africa. They are expected to arrive in the country on Wednesday. Maintenance work on the machines is expected to take 10 days.”

But when contacted again to justify the substantial increase in electricity demand, Chitosi asked for more time.

Malawi Confederation of Chambers of Commerce and Industry (MCCCI) is on record as having said that load shedding affects the economy negatively and slows down economic growth.

MCCCI president Prince Kapondamgaga said electricity ranked as the second most obstacle to doing business after high cost of finance.

Malawi continues to face power supply challenges from the national grid despite licensing a number of independent power producers,  most of whom are yet to rollout.

Escom has set a 2022 target to meet electricity demand, largely from the power interconnection deal with Mozambique currently being worked out.

In December 2019, demand for electricity during peak hours stood at 303.1MW.

Egenco generates most of its power through hydro with 136MW from Nkula Hydro Power Station (A and B), 102MW from Tedzani (I, II and III), Kapichira 129.6MW and Wovwe 4.5MW.

Source: The Nation_23 March, 2020_by Jonathan Pasungwi—Additional reporting, Orama Chiphwanya, Staff Reporter








Post navigation

GIZ seeking Applications for 2020 Innovation Challenge
No quick fix to energy woes

Recent Posts

  • Solar power supplies water to rural areas
  • We no longer do pipes’ work
  • ‘Fetching water was hard labour’
  • Edukans connects 10 schools to solar power
  • Malawi’s growing population, dying environment

Contact Us

Cooperation Network for Renewable Energy in Malawi (CONREMA)

Secretariat

c/o Renew‘N’Able Malawi

P.O. Box 31219 – Blantyre 3

Malawi

Telephone:  +265 999 608 501

Email: contact@conrema.org

Subscribe

Subscribe to our News letters


copyright @ 2018| Developed by Beta Solutions
  • Sign in
  • New account

Show

Forgot your password?

Lost your password? Please enter your email address. You will receive mail with link to set new password.

Back to login

close

Please Login

Registration

Forgotten Password?

Register Forgot Password Back to Login