Email contact@conrema.org
Phone +265 999 608 501
  • Home
  • About
  • News
    • Bio Energy
    • Climate Change
    • Deforastation
    • Energy and Gender
    • Malawi Energy Sector and Policy
    • Re-Strategic and Policy
    • Renewables Vs Fossils
    • Re-afforestation
    • Resources and Tools
    • Solar
    • Technology
    • Uncategorized
    • Forums
  • Project Database
    • Search Database
    • All Projects
    • Add New Project
  • Stakeholders Database
  • Vacancies & Opportunities
  • Downloads
  • Contact
  • Log In

Egenco resumes normal power generation

12 Mar 2019

Electricity Generation Company of Malawi (Egenco) says it has resumed normal power generation at Nkula and Kapichira hydropower stations, assuring of normal and improved electricity supply.

Due to incessant rains the country experienced last week, Egenco shut down its Nkula A and B and Kapichira power stations after debris blocked intake screens.

Speaking during a tour of Nkula  by Minster of Natural Resources, Energy and Mining Aggrey Masi on Sunday,  Egenco chief executive officer William Liabunya said almost all machines are now up and running days after they were shut down, reducing power generation to 161 megawatts (MW) against the demand of 351MW.

He said: “After the disaster, we only had Tedzani running, but presently last but two machines have been put back to work.

“As of now, we are remaining with one unit which might take longer because it had an explosion of the transformer, but an assessment team is currently on the ground to rectify the problem.”

Nkula hydro power plant: Malawi heavily relies on hydro power generation

Liabubya said currently, about 306MW of electricity is available for distribution.

On his part, Masi justified the move by Egenco to temporarily shut down the machines, saying if left to run, they would have been completely damaged.

“If not for the swift action by the engineers here, the situation could have almost been a national disaster. We could have been in a blackout for a long time, but thanks to the team for coming in handy to control the problem,” he said.

Between 2014 to last year, Malawians experienced power cuts that at times lasted 18 hours a day due to lower water levels in Shire River, the main source of hydro power generation.

During the current rainy season, Malawi has received consistent rains and normal power supply resumed in December last year.

Source: The Nation _Orama Chiphwanya, March 12, 2019








Post navigation

Bishop appeals for viable energy mix
‘Malawi needs real energy solutions’

Recent Posts

  • Solar power supplies water to rural areas
  • We no longer do pipes’ work
  • ‘Fetching water was hard labour’
  • Edukans connects 10 schools to solar power
  • Malawi’s growing population, dying environment

Contact Us

Cooperation Network for Renewable Energy in Malawi (CONREMA)

Secretariat

c/o Renew‘N’Able Malawi

P.O. Box 31219 – Blantyre 3

Malawi

Telephone:  +265 999 608 501

Email: contact@conrema.org

Subscribe

Subscribe to our News letters


copyright @ 2018| Developed by Beta Solutions
  • Sign in
  • New account

Show

Forgot your password?

Lost your password? Please enter your email address. You will receive mail with link to set new password.

Back to login

close

Please Login

Registration

Forgotten Password?

Register Forgot Password Back to Login