Email contact@conrema.org
Phone +265 999 608 501
  • Home
  • About
  • News
    • Bio Energy
    • Climate Change
    • Deforastation
    • Energy and Gender
    • Malawi Energy Sector and Policy
    • Re-Strategic and Policy
    • Renewables Vs Fossils
    • Re-afforestation
    • Resources and Tools
    • Solar
    • Technology
    • Uncategorized
    • Forums
  • Project Database
    • Search Database
    • All Projects
    • Add New Project
  • Stakeholders Database
  • Vacancies & Opportunities
  • Downloads
  • Contact
  • Log In

Escom paints darker energy picture

16 Nov 2018

Electricity Supply Corporation of Malawi (Escom) has painted a gloomy picture for the country’s power situation, stating that the current power outages are here to stay in the short-term.

During a news conference on the status of the country’s electricity generation and supply in Blantyre on Wednesday, Escom chief executive officer Allexon Chiwaya said Malawi is facing acute power supply challenges due to the reduction in water levels in Lake Malawi, a situation that has affected the country’s main electricity generation.

He said subsequently, power generation capacity has reduced to around 216 megawatts (MW), including input from diesel-powered generators installed in the country’s three cities.

Chiwaya said Electricity Generation Company (Egenco), Escom’s main supplier, is producing 177MW through its hydro source and 38.4MW is from diesel generators which run for six hours a day. The country’s electricity demand is pegged at 351MW.

He said: “We are buying all the power generated in the country. Unfortunately, all that power is from hydro generation through Egenco and because Shire River flow is getting reduced due to reduced water levels, the country is unable to produce the power.”

However, Chiwaya said generation could improve with the onset of the rains in the next few weeks.

In the short-term, he said, Escom is banking on the 20MW power import agreement from Zambia Electricity Supply Corporation (Zesco) which has since been finalised.

Chipping in, Ministry of Agriculture, Irrigation and Water Development director of water resources Prince Mleta described the situation as worrisome, saying naturally some parts of the country should have started receiving rains which is not the case.

He said the situation was worsened by Mwera (South Easterly) winds, evaporation of water from Lake Malawi and delayed commencement of the rain season.

To further alleviate the problem, Escom says it is incorporating more Independent Power Producers (IPPs) and said it would revise the loadshedding programme.

Recently, Escom signed three Power Purchase Agreements (PPAs) with two IPPs to produce an additional 86MW that would be added to the national grid by mid next year.

(Source: The Nation Malawi, Thursday 15, November 2018)








Post navigation

Small-scale firms feel pinch of electricity hike
Banks dared on energy solutions

Recent Posts

  • Solar power supplies water to rural areas
  • We no longer do pipes’ work
  • ‘Fetching water was hard labour’
  • Edukans connects 10 schools to solar power
  • Malawi’s growing population, dying environment

Contact Us

Cooperation Network for Renewable Energy in Malawi (CONREMA)

Secretariat

c/o Renew‘N’Able Malawi

P.O. Box 31219 – Blantyre 3

Malawi

Telephone:  +265 999 608 501

Email: contact@conrema.org

Subscribe

Subscribe to our News letters


copyright @ 2018| Developed by Beta Solutions
  • Sign in
  • New account

Show

Forgot your password?

Lost your password? Please enter your email address. You will receive mail with link to set new password.

Back to login

close

Please Login

Registration

Forgotten Password?

Register Forgot Password Back to Login