Email contact@conrema.org
Phone +265 999 608 501
  • Home
  • About
  • News
    • Bio Energy
    • Climate Change
    • Deforastation
    • Energy and Gender
    • Malawi Energy Sector and Policy
    • Re-Strategic and Policy
    • Renewables Vs Fossils
    • Re-afforestation
    • Resources and Tools
    • Solar
    • Technology
    • Uncategorized
    • Forums
  • Project Database
    • Search Database
    • All Projects
    • Add New Project
  • Stakeholders Database
  • Vacancies & Opportunities
  • Downloads
  • Contact
  • Log In

Escom says power outages to persist

20 Mar 2023
NEEDS RESTORATION—Escom pole being lifted
William Liabunya

Cyclone Freddy’s impact has been felt hard on the electricity supply side as State-run Electricity Supply Corporation of Malawi (Escom) says it needs “a few weeks more” to assess the damage and restore supply to pre-cyclone levels.

On the other hand, Electricity Generation Company (Egenco) says the cyclone effect on its generation machines remained minimal.

Over 72 hours of non-stop rains and heavy winds caused floods and mudslides which had damaged power lines, roads and farmlands and livestock in about 10 districts of the Southern Region.

Giving an update on the energy situation in a live television broadcast on TTV on Wednesday, Escom Chief Executive Officer Kamkwamba Kumwenda said the firm is yet to assess the extent of the damage to determine infrastructure that could be re-used or replaced.

 

 

He added that most of the areas which are going for days without electricity may have been affected by damaged feeder infrastructure such as poles and transformers to such areas.

“We have been dealt a heavy blow by the disaster. A lot of our poles and transformers have fallen, which has increased cases of vandalism and theft of our infrastructure. We are waiting for the rains to stop so that we can go around the affected areas to determine the extent of the damage,” Kumwenda said.

Egenco Chief Executive Officer William Liabunya said machines have not been greatly affected as engineers were able to shut them down before the cyclone could any havoc.

“Out of our 15 machines, we have 12 that are okay to run. We only shut them down to prevent them from being damaged by the huge pressure from the increased waster volumes and debris.

“If the water level reduces and we remove all the debris, we should be able to go back to pre-cyclone generation capacity within three days. Currently we are able to run machines at intervals giving us over 150 megawatts (mw) but once the water level normalises, we should be able to generate over 200mw,” Liabunya said.

In a recent interview, Malawi Confederation of Chambers of Commerce and Industry President Lekani Katandula said there will be a significant adverse impact on the private sector due to intermittent power supply, road cuts and property damage affecting some businesses, staff and customers.

Source: The Daily Times_ March 16, 2023_by Chimwemwe Mangazi








Post navigation

Mera warns local innovators on safety
Escom to connect 50 000 customers

Recent Posts

  • Solar power supplies water to rural areas
  • We no longer do pipes’ work
  • ‘Fetching water was hard labour’
  • Edukans connects 10 schools to solar power
  • Malawi’s growing population, dying environment

Contact Us

Cooperation Network for Renewable Energy in Malawi (CONREMA)

Secretariat

c/o Renew‘N’Able Malawi

P.O. Box 31219 – Blantyre 3

Malawi

Telephone:  +265 999 608 501

Email: contact@conrema.org

Subscribe

Subscribe to our News letters


copyright @ 2018| Developed by Beta Solutions
  • Sign in
  • New account

Show

Forgot your password?

Lost your password? Please enter your email address. You will receive mail with link to set new password.

Back to login

close

Please Login

Registration

Forgotten Password?

Register Forgot Password Back to Login